HomeMy WebLinkAboutCOMM - Meeting Minutes - - 7-31-1928 - COMMISSIONER 68
MINUTE BO- OK
BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, PENNSYLVANIA
JAMES W.WALKER, J. ELMER JOHNSTON. W.A. BARNES, COMMISSIONERS
PRINTING
II
Office of the County Commissioners ,
Washington, Pa. , July 31, 1928.
Commissioners in regular session, members present being Messrs.
Walker and Barnes ; Mr. Johnston having notice of meeting, but absent;
joint meeting of County Commissioners and County Controller at 1:30 P M
to open bids for the construction of certain bridges and highways noted bqo
below; present for County Commissioners , kesBre . Walker and -barnes ;
for County Controller , Deputy Controller, M Y Decker; bids frim followQ
ing concerns for bridges and highway specified, were opened and read
in the presence of the County Commissioners , all bids being accompanied
by certified checks in amount required by Controller in his advertisement
for said bids ;
LIST, OF BIDDERS AYiD-AMOUNT-BID
July 318t, 1928'
No. Contractor Amount Bid
YCBRIDE ARCH, RACCOON CREEK ,fig
1. Shaid Contracting Co. , Elkins , W. Va. �25$139.35
2. IrcKelvey-Hine Co. , Pittsburgh, Pa. 26,712.65
7 5
3. Concrete Steel Br. , Co. , Clarksburg, W. Va. 277990'
4. Alfre4 De Polo & Co. , C6nnellavill6q Pa. 29,569.1. Petriello Bros . S. Brownsville , Pa. 29,626.25
6. Farris Engineering Co. , Pittsburgh, Pa. 30, 66.4
The C B Construction Co. , Beaver, Pa . 3-N 688
2ayette Contracting-.-,Co- , Brownsville, Pa. 30 78-15
9. Jas . W. Powers , Pittsburgh, Pa* 37,91 55-97
MCDONAM WATER WORKS BRIDGE, RACCOON CREEK 210
1. Petriello Bros . , S. Brownsville,, Pa. 13,399-9 8
2. Purdy & Sanders , Clinton, Pa. 13 ,461. 6
3- Shaid Contracting Co. , Elkins , W. Va. 13 $544.00
4. Concrete Steel Bridge Co. , Clarksburg, 71. Va. 13 ,825-70
5. Rust Engineering Co. , Pittsburgh, Pa. 15,407.91
6. Ferris Engineering Co. , Pittsburgh, Pa. 15,
M.bo
The C B Construction Co. , Beaver, Pa. 165'$, 46.66
9*- J. W. McLoughlin, Jr. , Pittsburgh, Pa. 19,180.86
BAVINGTON ARCH RACCOON CREEKh718
1. Fred Saxon, Fredericktown, Pa. $19*199.85
2. Purdy & Sanders , Clinton, Pa. 20,462.63
3 - Concrete Steel Br. Co. , Clarksburg, W. Va. 22,22 1
4. McKelvey-Hine Co. , Pittsburgh, Pa. 22,499.65
5. Petriello Bros. , S. Brownsville , Pa. 22,931-03
6. Ferris Engineering Co. , Pittsburgh, Pa. 230167-50
7. ---'ayette Contracting Co. , Brownsville, Pa. 23,248.45
8. Alfred De Polo, Connellsville, Pa. 23 ,894:89
9. The C. B. Construction Co. ) Beaver, Pa. 24,649.�q
10. J. W. McLoughlin Jr. , Pittsburgh, Pa. 2Z,169.61
11. Jas . W. Powers , Pittsburgh, Pa. 752-75
12. Lewis Costa, Dawson, Pa. 37,991.67
69 ,
MINUTE BOOK
BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, PENNSYLVANIA
JAMES W. WALKER, J. ELMER JOHNSTON, W.A. BARNES, -COMMISSIONERS
GASTvONVILLE BRIDGE,- PETERS CREEK 3
1., Fred Saxon, Fredericktown, Pa. $8o569.80
2. Ross Construction Co. t Pittsburgh, Pa. M06-75
3- Samtl McLaughlin & Son, Vandergrift, Pa. 10,427.40
4. Petriello Bros. , S Brownsville, Pa. 11i424.00
5. Piatt Bros . , Bridgeville, Pa. , R. D-. #1 lip'997.55
6. Concrete Steel Br. Co. , Clarksburg, W. Va. 1.3 ,131-73
Harry J. Ashcraft, Monongahela, Pa. 13 ,891.25
Farris Engineering Co. , Pittsburgh, Pa. 14,426.00
9: A. G. Rothey, Elizabeth, Pa. 15,650.91
DEEMS-BENTLEYVILLE ROAD
10 $47,846.o0
2. The C B Construction Co. , Beaver, Pa. 49, 587-00
3- Ilosteller & Virgin, Wilkinsburg, Pa. 490602.40
4. Roy E. Furman, Waynesburg, Pa. 49,643.60
5. Irwin X Nelan, Washington* Pa* 51-712-70
6. J. F. .atterson 52267-00
7. A. G. Rothey, Elizabeth, Pa. 3- :3- 6o.20
8. Philip De Rienzo , Fayette City, Pa. 55,23 00
9. John Herds Washington, Pa. 56 8290.40
10. Petriello Bros . , S. Brownsville, Pa. 58:284.50
ll. Thos. Arrigos, Charleroi, Pa* 60,503.98
The County Engineer was directed to tabulate all bids and make
report of same to County Commissioners at a later date, when contracts
would be awarded.
There being no further business before the joint meeting, it was
adjourned.
(SIGMM)
IS=SIOMMS.
owl
'UNTY�'Isls I0=S