BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, PENNSYLVANIA
JAMES W. WALKER, J. ELMER JOHNSTON, W.A. BARNES, COMMISSIONERS
Office of the County Commissioners,
Washington, Pa., December 14, 1928.
Commissioners in regular session, members present being Messrs. Johnston,
Walker and Barnes.
1411otion by Mr. 'Walker, seconded by Mr. Barnes, that County Treasurer be
directed to transfer, with approval of County Controller, the sum of One Hun-
dred Thousand ($100 000.00) Dollars from the Road Funds of the County of
Washington, to the Gendral Fund of said County, for the purpose of meeting cur-
rent expenses of the County. Motion unanimously carried.
Approved:
T_ J Underwood,
Co=UW Controller
------------
December 14th
Commissioners in regular session, members present being Messrs. Walker,
Johnston and Barnes;--
The following Resolution was, presented, duly seconded, and adopted;--
Whereas,, the State Highway Department has under construction Section 7 A
of State Highway -locate No. 268,, in East Pike Run and Ellsworth Borough,, at
cost of $66, 553.75, now,
Be it Resolved:--That the total cost of contract be now fixed at $82,, 518-87,
which includes t--e sum of s5682.06, in excess of15 per cent allowed for in
original contract,, for changes, alterations and improvements and that the County
of Washington shall pay 50 per cent of total cost and expenses of such improve-
ment-------and
Le it Resolved;-That the Donora Construction Company, under its contract
for construction of State Highway Route No. 240, Section 10,, Application No.
4094-4095,, be authorized to make additional improvements; 45.65 sq yds. Subgrade;
326 lin. ft. Shoulders; 39.97 sq yds. Reinforced Concrete Pavement; 0.4 lin.
ft. Concrete Pipe; 2.8 lin. ft 540"Reinforced Concrete Fipe; 185 cu. ft. 4" Tile
underdrain2 to be paid at contract unit price; the additional estimated costs
being $408.46 under this authorization.
1-02 MINUTE BOOK
BOARD OF COUNTY-COMMISSIONERS WASHINGTON COUNTY, PENNSYLVANIA
JAMES W. WALKER, J. ELMER JOHNSTON. W.A. BARNES, COMMISSIONERS
iiA_RDPk_1WT_1NQ CO. W511
fF
Dec. l4th
oommissioners in regular session, members present being Messrs. Walker,
Johnston and Barnes;--
T4e following Resolution waz, presented duly seconded and adopted;--
vihereas,, the State Highuay Department has under construction Section 7 A of State
!Ilighway Route 11-0. 268) in East Pike Run and Ellsworth Borough, at cost of $
$66, 553/75, now,
Be it Resolved:--That the tat"4%pt of contract be now fixed at
�82, 518-87, which includes the sum of $5982.06, in excess of 15 per cent allowed
for in original contract, for changes, alterations and improvements and that the
County of Washington shall pay 50 per cent of total cost and expenses of such im-
provement-------and
Be it Resolved:-That the Donora Construction Company, under its contract
for construction of State Highway Route No. 240, Section 4-0, Application No. 4094-�
4095, be authorized to make additional improvements; 45*65 sq. yda. aubgrade;
326 lin. ft. Shoulders; 39.97 sq yds. Reinforced Concrete Pavement; 0.4 Lin.
ft Concrete Pipe; 2.8 lin ft. 5411 Reinforced Concrete Pipe; 185 cu,,, ft. 411 Tile un.
derdrain, to be paid at contract unit price; the additional estimated costs being
408.46 under this authorization.
There being no further business the Board adjourned,
(SIG11ED)
COITNTY COMMISSIOINIM.