Loading...
HomeMy WebLinkAboutCOMM - Meeting Minutes - - 3-24-1920 - COMMISSIONER "���/, � - .��= ! MINUTE . BOOK | - ^ � BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, PENNSYLVANIA 7.72 No further--business appearing the Board adjourned. COUNTY COMMISSIONERS. The County Commissioner* of Washington and vestjj-kelj�*!t�iAty met MINUTE BOOK BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, PENISYL:VAMA j J ELMER JOHNSTON, JAMES W WALKER, W H ECKER, COMMISSIONERS t in joint-executive session today with present: I Berkey H Boyd J L Johnston Geo W Deeds J W Walker j W D Reamer, W H Baker Commissioners Westmoreland commissioners of Washington County County Thos J Underwood Controller of Washington Cody. i Mr. Johnston was president and Mr. Boyd the Secretary of the f joint meeting. a . It was regularly moved and seconded that the trolley rails be moved from the approaches to both ends of the Webster-Donora ?nter-County • Bridge, spanning the Monongahela River. Potion passed unanimously. "' I It was regularly moved and seconded that the Counties of 'Washington and Westmoreland accept the proposition of the Farris Engineering Co7mpany,° Of � i , Pittsburg, f said g Pa. , proposition be approved by the Controllers of said ; counties, said proposition being under date of March 12th, 1920: "For ,jacking or lifting the shoes, removing, *leaning, relocatfbg and putting the roller nests in workable condition on the three 184, spaps,• the one 2201 span and the 5151 or channel span (Webster-Donors Shter-Co Vnty Bridge) we are pleased to quote you a lump sum price of Five Thousand Fire - dred ($5500.00) Dollars. "This quotation is based on the condition that we have the privilege of removing a portion of the cover plate on the and post of the channel span, 1 which would be replaced in good condition with an additional splice plate, If you would deem it necessary, and with- the understanding that traffic ,aan be stopped entirely on the bridge during the short interval of time when we 'were lifting any particular shoe. The price is -also based on the condition 1 that the jacking and other work can be done along at -the time of our other op- erations and.while part of the dead load is off the bridge and on this tc�cteat the quotation is offered only for very prompt acceptance." .AND IT 19 FURTHER AG RAND by th* two counties that the work-e d ' . � �be done according �: 4 or ing to plans and Specifications to be prepared by the �� Engineer of Washington County. "Ubtion-,passed unanimously. There being no other business the ,joint-meeting then regula�c�i�,.r� ..� adjourned. = Attest . � � o stun • PRESET-Q?�:qoj$t`° ? Berke,y H Boyd SECRETARY OF JOINT MEETING. The above minutes examined and found correct. • = �